There are two broad ways to build software for someone. The first is to agree a specification, go away, build all of it, and come back with the finished thing. The second is to build it in pieces, showing each one as it takes shape, and adjusting as you go.
We work the second way. This post explains why, what you will see along the way, and what we mean when we ask you to approve a stage. It sits within the wider journey described in How a Software Builders project runs.


The problem with the big reveal
The appeal of building everything and then revealing it is obvious. You do not have to think about the project for a while, and at the end you get something finished.
The trouble is that a specification, however careful, is words on a page. Words are read differently by different people. A screen you imagined one way gets built another way. A feature that sounded essential turns out to be rarely used once you see it working. A small misunderstanding early on shapes everything built on top of it.
With a big reveal, all of that surfaces at the end, when changing course is expensive and frustrating for everyone. Nobody is to blame. It is simply what happens when feedback arrives late.
Why stages work better
Building in stages moves feedback earlier. Each stage ends with something real that you can look at, click through or try on your phone. If it is not quite right, we find out while the change is small.
This is not a new idea. Public bodies in the UK use it widely for digital services. The government's Service Manual sets out how teams work in an agile way and describes services moving through phases such as discovery, alpha, beta and live, rather than being delivered in one go (GOV.UK Service Manual, agile delivery). We are a much smaller operation, and we do not use the government's process, but the principle carries across: learn as you build, and let what you learn shape what comes next.
Stages also make progress visible. You are not left wondering whether anything is happening. You can see the project moving, and you have regular, natural points to raise questions.
What a stage looks like
The exact stages depend on the project, and they are set out in your scope of works. Most projects follow a similar pattern.
Structure and flow
The first stage is usually about how things fit together. For a website, that is the main page types and how visitors move between them. For an app or custom software, it is the main screens and the steps a user takes to get a task done.
At this point things may look plain. That is deliberate. We want you to focus on whether the structure makes sense before we spend time on how it looks. It is much easier to move a button in a sketch than in a finished design.
Look and feel
Next comes design: your brand, colours, typography and the overall feel. We usually show a small number of key pages or screens first, agree the direction, and then apply it consistently.
Working features
Then we build the parts that do things. Forms that send, accounts that sign in, products that can be added to a basket, records that save and reappear. Each feature is shown working, ideally with realistic content rather than dummy text.
Connections and data
Where the project connects to other systems, such as payment providers, accounting software or an existing database, we build and test those connections in their own stage. They often have the most unknowns, so it helps to tackle them while there is still room to adjust.
Content and polish
Real content goes in, edge cases are handled, error messages are written in plain English, and everything is checked on different devices and screen sizes.
Ready for launch
The final stage is a complete version, running somewhere you can try it before anyone else sees it. Once you are happy, we plan the go-live together, as described in launch day.
How you see each stage
When a stage is ready for you, it appears in your client portal as an update marked as awaiting approval. The update explains in plain words what has been done, what you should look at, and anything we need from you.
You have two choices. You can approve it, or you can ask for changes and tell us what you would like different. If you are not sure, ask a question. A stage does not need to be approved the moment it arrives.
Some of these updates are drafted by one of our AI assistants, which turn project activity into plain-English summaries. Anything that mentions timelines, costs or scope is checked by Carl before it reaches you.
What approval means
Approving a stage is a simple statement: "this stage does what we agreed, and you can build the next one on top of it."
It does not mean you can never change anything in that stage again. It means that, from now on, changes to it are treated as changes rather than as part of finishing the stage. That distinction matters because later stages are built on earlier ones. If the structure changes after the design has been applied to it, some of that design work may need to be redone.
Approval also gives both of us a clear record. Months later, if someone asks why a page works the way it does, we can see when it was agreed and by whom.
Only the approvers at your company can approve updates. If more than one person needs to agree, it is worth deciding early who has the final say.
How to review a stage well
You do not need technical knowledge to review a stage. You need to look at it as the people who will use it would. Our post on giving useful feedback goes into detail, but a few habits help:
- Try it, do not just look at it. Click through, fill in a form, try it on your phone.
- Think about real users. Would a new customer understand this? Would a busy member of staff find it quick to use?
- Separate "wrong" from "different". Something that does not match what was agreed is different from something you would now like to change.
- Write it all down in one place. One complete list is easier to act on than several messages over a few days.
- Say what is good, too. Knowing what works helps us keep it.


When you want to change direction
Sometimes a stage shows that an idea does not work as well as expected. That is one of the benefits of working this way. It is far better to find out after the structure stage than after launch.
If you want to change direction, tell us. We will look at what it affects, whether it fits within the agreed scope or needs a change, and talk it through with you before doing anything. Our post on handling change requests explains the process.
Where you see the work
During the build, your project lives somewhere private that you can visit but the public cannot. For a website or web app, that is usually a preview address. For a mobile app, it is usually a test version you install on your own phone through the platform's testing tools. For custom software, it is a test copy with sample data.
Working in a private copy means we can show you unfinished work without it ever being seen by customers. It also means you can try things without worrying about breaking anything. Sample data is just that, so go ahead and fill in forms, place test orders and click every button.
When the time comes to launch, the work moves from that private copy to its live home. Because you have already been using it, launch day holds far fewer surprises.
If you are too busy to review
Owners are busy. Reviews sometimes slip, and that is understandable. A few things help:
- Tell us. If a review will take longer than usual, a quick message lets us plan around it.
- Delegate if you can. If someone else at your company can review a stage, make them an approver.
- Do a short review. Even a quick look at the main things we flagged is better than nothing. You can always follow up with more detail.
- Use a voice note. Talking through what you see while you click around is often quicker than writing. Our post on voice-note collaboration explains how.
What we will not do is quietly carry on building on top of a stage you have not seen. If a review is outstanding, we will remind you, and we will be clear about what is waiting on it.


Stages and payments
Because stages give clear points where work is finished and agreed, they are also a natural way to structure payment. Your agreement sets out whether and how payments are linked to stages. Whatever it says, you will always know in advance what an invoice relates to, because it will match a stage you have seen.
What stages are not
Stages are not a way to make a project longer. Each one is planned in the scope, and each one moves the project forward.
They are also not an invitation to redesign everything at every review. The aim is to confirm each layer before building the next. Small refinements are normal. Large changes are possible, but they are handled as changes, so you can see their effect before agreeing to them.
And stages are not a burden on your time. A review might take a few minutes or an hour, depending on the stage. We tell you what to look at, so you are not left wandering through everything wondering what is new.
What this means for you
Working in stages asks a little more of you during the project: a few reviews, some decisions, occasional questions. In return you get a project with no big surprises, a finished product you have seen take shape, and a clear record of how it got there.
If you would like to see how we would stage your project, get in touch and we will talk it through.